Login|Register|Forget password|Dashboard Back to Home|Contact|Shopcart
Unverified1st Year

Ningbo Ecotrust Machinery Co., Ltd.  

Search
新闻中心
  • 暂无新闻
产品分类
  • 暂无分类
联系方式
  • 联系人:Sean Jiang
  • 电话:86-574-87919325
  • 传真:86-574-87919327
站内搜索
 
荣誉资质
  • 暂未上传
友情链接
  • 暂无链接
首页 > Products > Three-Axis Servo High Speed Fast Precision Robot Arm for 160-200 Ton Plastic Injection Molding Machi
Three-Axis Servo High Speed Fast Precision Robot Arm for 160-200 Ton Plastic Injection Molding Machi
单价 $10.00 / Set对比
询价 暂无
浏览 121
发货 Chinazhejiangningbo
库存 2000Set
过期 长期有效
更新 2020-09-05 05:33
 
详细信息
Product Name: Three-Axis Servo High Speed Fast Precision Robot Arm for 160-200 Ton Plastic Injection Molding Machine for for Pick up Eye Shield and Safety Goggle Factory Pric Model NO.: Three-Axis Servo Robot KAW-850 Suitable for 160-20 Application: Plastic Machine Condition: New Drive Mode: Electric Control Mode: Point to Point Control Certification: CE Muscle Size: 1~11kg Competitive: Best Price Performance: High Quality Stable: High Efficiency Durable: Long Life Environmental: Low Consuption Digitalization: PC & Network Trademark: ECOTRUST Transport Package: Standard Export Packing Specification: Three-Axis Servo Robot KAW-850 Suitable for 160-20 Origin: Ningbo, China HS Code: 8479509090 Product Description Intelligent Series Technical Parameter:ModelUnitKAW-750KAW-850KAW-950TypeDouble sectionThree-Axis Servo RobotVertical strokemm750850950Crosswise strokemm80011001200Swing strokemm168020002300Drive systemX YZ Axis Servo motorGripper rotation angleo909090Max load(with tool)kg333Minimum takeout timesec222Dry cycle time(without tool)sec99.59.5Working air pressurekgf/cm²5--75--75--7Air consumptionNL/cycle252525Power consumptionKVA1.51.51.8PowerAC220V 50/60Hz220V 50/60Hz220V 50/61HzNet weightkg220230230Technical Features:Suitable for 90-320T injection molding machineX YZ axis is driven by imported AC servo motors. The XY Zarms use the light-weight and high-rigid aluminum alloy structure beams, which can meet the requirements of fast fetching, smooth and unhindered action, high efficiency, low vibration and long service life.Double-section armIt adopts the high-rigid linear sliding rails, aluminum alloy structure beams, specially designed rack and belt speed multiplier, which greatly shortens the height of the upper and lower arms.It takes only half of the stroke to reach the full stroke. In addition to increasing the speed and stability of the up and down stroke, it can adapt to the places with low height in the factory and uses a90 degree -interlocking equipment to make the arm more stable, smooth and fast. Product patent number: CN201620682443.8.Jig CircuitThe pneumatic pipeline and inspection signal are pre-set for the jig, with three return circuits for both sucking and holding. This structure can be used for such take-out operations of the jig as sucking, nipping and holding as well as for take-out of various finished products. The side mechanism can be removed by using the male or female mold. The rotation angle is 90 degree.Standard FunctionMidway runner releaseRunner is released at aplace different from product.Descent during mold openUsed to shorten the mold cycle by starting the descending of arm on the way to mold open.Mold close during arm ascentUsed to shorten the molding time by starting the mold closing on the way to ascent.Plastic runner can be released at anyplace of the traverse axisRunner is released at aplace different from product.Internal memory storageController memory for mold program information. USB device for ease of program storage, even during normal operation, which is faster and more convenient.Alarm(Buzzer)optionalThe alarm lamp(Buzzer) is switched on alight when there is aalarm(error) in the robot.Conveyor interfaceControl conveyor functions.Air nipper circuitWhile cutting runner, use this function.(Scissor device is optional cost).Fixed side/moving side switchInjection molding machines is designed to eject product from the moving side normally. Use fixed-side/moving side function to suit for ejecting product from the side of moving side.Vacuum confirmation circuitWhile part need to use suction cup by vacuum, it can be confirmed by this circuit.Mold area movementRobot can move freely in the mold area to take out the product with barb or others.Release or grip in mold areaCan release part or runner in mold area after grip the runner or absorbs the part.Defective product reject circuitDefective products are separated by interface signal from I.M.M.Outside mold area stand-byRobot can stand-by outside mold (outside the safety door) when robot end arm meets those mold obstructions.Language selectionLanguage can be changed between Chinese and English.Product extract posture controlUsed to carry out posture action until arm ascent to aproper position to do the movement. In order to avoid collide with the safety door of IMM or the robot arm truck during the moving section.Horizontal or Vertical During TraverseThe product release after each posture is carried out at product release position. All the cycles can also be shorten by carrying out posture smoothly as traverse moving over and starting to return.Arm descent delayUsed to shorten the extraction time by letting the vertical arm stand by at just top of the mold before mold open, and adjust the extraction stroke to the shortest.StackingUsed to stack product at an arbitrary position within the region according to the actual requirements.Optional FunctionReserved additional I/O pointAdditional inputs and outputs points are available if the standard ones art not enough.Reinforcement of posture torqueReinforce the posture part, and improve torque when the EOAT rotating.Robot &I.M.M information exchange manipulatorsRobot and I.M.M information exchange manipulators use BCO signal switching and /confirm/iation, robot can call those corresponding parameters automatically after I.M.M changed mold.Application:>KEFAI Robot is widely used. Automobile interior parts, exterior parts, plastic pipe fittings, white home appliances, black home appliances, toy industry, household plastic products and other deep cavity products processing, dustbins and so on.Factory:Ningbo KEFAI Robot Factory, ahigh-tech enterprise specializing in the research and development of industrial automation products such as injection molding machine manipulator and hardware punch manipulator since 2008, is an automation enterprise integrating independent research and development, production and manufacturing, marketing and service, with many years of experience in the automation city. From 50t to 4000t, all kinds of injection molding machines can provide planning, design, manufacturing, assembly and sales of supporting products. Provide customers with the best overall automation solutions and services. Mainly for customers to provide low-cost, high-quality, efficient automation products.Customer Cases:Our Service:Package&Shipping:FAQ:Q1: How long can it be delivered after the order is placed?If all the ordered goods are in stock, they can be delivered within 5-7 days after the order is placed;In case of no inventory of the order goods, the goods can be delivered within 20-25 days after the order is placed.Q2: How can Ibuy something different from what Isee on the website?Because the manufacturer will change the product packaging, place of origin or some accessories without any prior notice. We can't make sure that the goods received by our customers are completely consistent with the pictures, places of origin and descriptions of attachments on the website. We can only make sure that it is genuine! And ensure the same mainstream products with same parameters in the market at that time.Q3: What should Ido if Ifind quality problems in the process of using my product?In case of quality problems, if you need after-sales service, you can contact us for communication and solution; our engineers provide 24-hour online guidance to solve the problems.If you need to replace the parts, we will provide them to you in the first time through international express. You will get new parts in 3-5 days.Q4: Can Ichoose to buy equipment through Made-In-China company?If you buy our products for the first time, we will fully cooperate with your choice, and you can buy them in any way.We have aprofessional international trade team, can provide you with SGS, shipping, customs clearance services, please feel free to buy.Q5: Does the machine have an English manual and warranty card?Each machine has aprofessional English operation manual and warranty card.In addition, we can provide electronic version of the English manual.Q6: The delivery time of products without stock is too long for 25 days.First of all, we will speed production to meet your needs.In addition, we recommend that you have similar equipment in stock to meet your needs as soon as possible.Q7: What if Ichoose the wrong machine?We have pre-sales engineers with rich professional knowledge. According to your products, we provide the most suitable machines and solutions. Before placing an order, we make sure you don't choose the wrong machine.Q8: Who is responsible for the installation and debugging of the machine Ipurchased?We the seller are fully responsible to send our engineers within two weeks from the date of the containers arrival to the buyers factory to commissioning the machine and training the staff of the buyer, the buyer should be responsible for around trip economy ticket, ahotel and any other necessary accommodations for the seller's engineers, and engineer cost USD 100.00 per day.Q9: Do you have an aftermarket warranty for your products?Warranty: General one year for whole injection molding machines, two years for tie bar, three years for platens. Six months for screw and barrel with new material.General one year for other types of whole machines.All customers that have bought ECOTRUST injection molding machines would be provided with alifetime repair service of the machines.